Projects

ZOO INTERCHANGE TUNNEL, MILWAUKEE, USA

The Zoo Interchange Tunnel project consists of two new tunnels constructed during the improvement of the Milwaukee Interchange between US 41 and US 91. Each tunnel has its own independent lighting control system. Each control system dims up and down the installed LED luminaires based on external luminance conditions. Remote control and monitoring is implemented thanks to the TLACS Network Controller’s embedded web server.

  • 2 new tunnels
  • Curved tunnels
  • Length 70 m each
  • 198 LED luminaires
  • TLACS-EM