Marina Coastal Expressay (2010-2013) in Singapore

New 3.5 km tunnel in Singapore.

This new 3.5 km tunnel with 2 bores with 5 lanes in each direction, is the extension of the KPE tunnel.. Completed in 2013, TLACS now controls both tunnels under the same SCADA system.

Solution

TLACS-EM

Characteristics

  • 3.5 km tunnel
  • Built to carry 10 000 vehicles per hour in each direction
  • 2 bore / 10 lane expressway
  • 8 500 luminaires
  • After the project completion, both tunnels (KPE and MCE) will be managed by the same system controlling 25 000 luminaires.