Skip to content

MITCHELL INTERCHANGE IN MILWAUKEE, USA

Rehabilitation of the Mitchell Interchange in Milwaukee.

As part of an overall $1.9 billion project to reconstruct I-94 through downtown Milwaukee at the intersection of Route 43, Nyx Hemera Technologies provided the tunnel lighting control system for the Mitchell Interchange.

Solution

TLACS-C

Features

  • Series of three (3) small tunnels (between 180 and 250m)
  • Three (3) inputs, three (3) outputs
  • 195,000 vehicles/day
  • 1830 luminaires
  • Completed in a record time of three (3) weeks from design to installation, to be operational in December 2011