MITCHELL INTERCHANGE IN MILWAUKEE, USA
Rehabilitation of the Mitchell Interchange in Milwaukee
As part of an overall $1.9 billion project to reconstruct I-94 through downtown Milwaukee at the intersection of Route 43, Nyx Hemera Technologies provided the tunnel lighting control system for the Mitchell Interchange.
Solution
TLACS-C
Features
- Series of three (3) small tunnels (between 180 and 250m)
- Three (3) inputs, three (3) outputs
- 195,000 movements/day
- 1830 luminaires
- Completed in a record time of three (3) weeks from design to installation, to be operational in December 2011
Facebook
Twitter
Linkedin
