Skip to content

MITCHELL INTERCHANGE IN MILWAUKEE

Rehabilitation of the Mitchell Interchange in Milwaukee.

As part of an overall $1.9 billion project to reconstruct I-94 through downtown Milwaukee at the intersection of Route 43, Nyx Hemera Technologies provided the tunnel lighting control system for the Mitchell Interchange.

 

Solution:

  • TLACS-C

Characteristics:

  • Series of three (3) small tunnels (between 585 and 744 ft)
  • Three (3) inputs, three (3) outputs
  • 195,000 vehicles/day
  • 1830 luminaires
  • Completed in a record time of three (3) weeks from design to installation, to be operational in December 2011

Subscribe to our newsletter