Skip to content

HARVEY TUNNEL, NEW ORLEANS, LA

1,079-foot tunnel, built in 1957, now equipped with Nyx Hemera Technologies’ TLACS-EM power line lighting control system, which controls and monitors all 336 luminaires with a dedicated lighting SCADA.

 

336 luminaires

1079 feet

TLACS-EM