Skip to content

HARVEY TUNNEL, NEW ORLEANS, LA

The 1,079-foot tunnel, built in 1957 is now equipped with Nyx Hemera Technologies’ TLACS-EM power line lighting control system, which controls and monitors all 336 luminaires with a dedicated lighting SCADA.

Solution

  • TLACS-EM

Characteristics

  • 336 luminaires
  • 1079 feet long